Christies Beach Outfall, Adelaide
Project Data
Dates
Project
Location
Details The chosen methodology was a bottom pull, featuring an on-shore winch pulling via a buried anchor offshore. This required the dredging and excavation of a trench through the beach and foreshore of up to 4 metres in depth, plus a shallow offshore trench. Concrete weight-coating of the steel segments and welding of the segments into strings was carried out in advance of the launch of the pipeline, successfully carried out over a four-day window. The project received an earth award in 2010.
Value
Client
Main Contractor
Project Photographs (click to enlarge) |