Wharves 11 and 12, Port of Brisbane
|
Dates
Project
Location
Details The works are being self-constructed and include the driving of a total of 686 steel pipe piles with lengths up to 48.5m, topped by an insitu concrete deck. The contract also includes the construction of a reinforced concrete abutment and relieving slab as well as the installation of fenders, crane rails, bollards, services and other miscellaneous works. Works are scheduled for completion in late 2012.
Value
Client
Main Contractor
Photographs (click to enlarge) |