Projects
Ferry Terminal, West End

The challenges at West End included working with minimal trimming of existing mangroves and fig trees, which enhance the beauty of the completed terminal.
Ferry Terminal, Northshore Hamilton

Mooring piles were driven using our construction barge “Leanora” with 180 tonne crane.
Wharves 11 and 12, Port of Brisbane

1.2m diameter piles up to 48.5m in length are being accurately driven using our stable construction barge “Maeve Anne”.
General Purpose Wharf

Contract included almost 300 steel pipe piles, both vertical in the wharf and raked in the dolphin structure, all driven from floating plant
Woody Point, Redcliffe

Construction was facilitated over the extensive tidal zone by an “over the top” method featuring a 12m cantilevered frame to support the service crane and provide access and support to the leading end.
Christies Beach Outfall, Adelaide

Our temporary bridge system was again used to facilitate the installation of a sheet-piled cofferdam and subsequent dredging of a trench through the surf zone at Christies Beach, south of Adelaide.
Kwinana Outfall Pipeline

Construction was facilitated by first installing a 10m wide temporary bridge as a work platform along the full length of the pipeline.