West End Ferry Terminal

West End Ferry Terminal
Client: Brisbane City Council
Location: West End, Brisbane River
Date: 2011

The challenges at West End included working with minimal trimming of existing mangroves and fig trees, which enhance the beauty of the completed terminal.

Northshore Hamilton Ferry Terminal

Northshore Hamilton Ferry Terminal
Client: Urban Land Development Authority
Location: Hamilton, Brisbane River
Date: 2011

Mooring piles were driven using our construction barge “Leanora” with 180 tonne crane.

Wharves 11 and 12, Port of Brisbane

Wharves 11 and 12, Port of Brisbane
Client: Port of Brisbane Pty Ltd
Location: Fisherman Islands, Port of Brisbane
Date: 2010 - 2012

1.2m diameter piles up to 48.5m in length are being accurately driven using our stable construction barge “Maeve Anne”.

Christies Beach Outfall, Adelaide

Christies Beach Outfall, Adelaide
Client: SA Water
Location: Christies Beach, Adelaide
Date: 2009

Our temporary bridge system was again used to facilitate the installation of a sheet-piled cofferdam and subsequent dredging of a trench through the surf zone at Christies Beach, south of Adelaide.

Woody Point Jetty, Redcliffe

Woody Point Jetty, Redcliffe
Client: Moreton Bay Regional Council
Location: Redcliffe Peninsula, Brisbane
Date: 2008 - 2009

Construction was facilitated over the extensive tidal zone by an “over the top” method featuring a 12m cantilevered frame to support the service crane and provide access and support to the leading end.

General Purpose Wharf

General Purpose Wharf
Client: Port of Brisbane Corporation
Location: Fisherman Islands, Port of Brisbane
Date: 2008 - 2009

Contract included almost 300 steel pipe piles, both vertical in the wharf and raked in the dolphin structure, all driven from floating plant