Client: Brisbane City Council Location: West End, Brisbane River Date: 2011
The challenges at West End included working with minimal trimming of existing mangroves and fig trees, which enhance the beauty of the completed terminal.
Client: SA Water Location: Christies Beach, Adelaide Date: 2009
Our temporary bridge system was again used to facilitate the installation of a sheet-piled cofferdam and subsequent dredging of a trench through the surf zone at Christies Beach, south of Adelaide.
Client: Moreton Bay Regional Council Location: Redcliffe Peninsula, Brisbane Date: 2008 - 2009
Construction was facilitated over the extensive tidal zone by an “over the top” method featuring a 12m cantilevered frame to support the service crane and provide access and support to the leading end.