Marine Infrastructure
Brady Marine & Civil have experience in delivering a variety of marine infrastructure, with particular success in projects involving a high level of technical challenge and complexity.

We are currently constructing two citycat ferry terminals on the Brisbane River, each with additional constraints brought about by the 2011 Brisbane floods.
![]()
Through Smithbridge Australia we have built a number of navigation beacons, each involving unique challenges. In 2006 we installed four large-diameter beacons at Hay Point, with pile weights up to 40 tonnes and located up to 14 km offshore.
![]()
In 2009 we salvaged and reconstructed a beacon in Moreton Bay using our barge Maeve Anne. This project included the challenge of recovering the damaged structure, a task which required the extraction and removal of raked piles which had been severed below the seabed.